Installation for feeding – metering liquids (molasses or oil) into the feed mixture during the mixing process. The installation consists of a tank of A’ materials which is normally supplied by the customer.
– GEAR PUMP suitable for viscous liquids driven by an electrical motor with a gear reducer.
– STAINLESS STEEL FILTER
– Tank for daily consumption in stainless steel metal sheets, with double wall for the installation of oil heating system.
– GEAR PUMP suitable for viscous liquids driven by an electrical motor with a gear reducer.
– FLOWMETER in stainless steel.
– ELECTRONIC QUANTITY SELECTOR.
– TIME COUNTER
– VALVE electropneumatic
– BLOWER / NEBULIZER
– SPRAYER with flexible piping and support base for the sprayer on the mixer.
– 1″ GALVANIZED PIPING SET, with the necessary connection components such as elbows, valves, etc.
– ELECTRICAL panel with general switch, remote controlled switches, automatic operation. Complete electrical installation with appropriate wiring, connection and protection.